3 ply sliding window will be installed here
Toilet demolishing and make it to kitchen
Washing machine location
Kitchen wall
Window in kitchen area
We will put tiles at the wall all the way up to ceiling
Changing door position of master bedroom
Toilet wall demolishing to separate it to wet and dry area

My bedroom, Erica was playing with the stick
Day 5 - 19th May 2007, toilet pipe is being concealed and kitchen carbinet and work top will be installed around the kitchen by then

Kitchen wall
This is the sample kitchen carbinet
Our kitchen carbinet will look like this when finished
Another similiar colour tone








No comments:
Post a Comment